Close-up of an electronic circuit board and its components

AI-assisted editorial content. Methodological examples are not completed audits or empirical results. Sources retain their recorded access dates; verify current applicability before relying on them.

Write the test agreement

A parallel run compares two processing results across the same set of cases. To make it useful, we propose a written test agreement before execution: what is compared, which data is equivalent, which differences are expected and who decides closure. The aim is to prevent criteria from changing after results are seen.

HMRC test data can contribute to UK payroll coverage; the UK Service Manual also describes the value of exploratory testing. These references help select different tools. The composition of a parallel run remains a project-specific decision to document and discuss with the relevant specialists.

Select a representative population

A sample consisting only of ordinary cases may give a misleading impression of the migration. Prepare a matrix of situations: joiners, leavers, changes during the period, variable components, adjustments and incomplete data. Selection should follow actual processes and differences between the systems, without treating this list as universal coverage.

In a synthetic example, the legacy system retains an aggregated pay element while the new system distinguishes two components. Comparing codes directly would create false differences. An approved equivalence mapping is needed, while original details must be retained to check that aggregation does not hide necessary information.

Assess the quality of the reference

The previous system is not automatically an infallible reference. If the new result differs, verification must be able to return to the rules and inputs. Plan a third source of evidence for disputed cases: an independent calculation, an applicable document or specialist verification. Comparison finds differences; it does not decide on its own which platform is correct.

Tolerances must fit the item and the control's purpose. Distinguishing an explained rounding difference from a formula applied to the wrong period prevents premature acceptance. Recording accepted differences allows them to be reassessed when scope changes or further effects emerge.

Prepare to exit the parallel run

The final report should connect each requirement to the executed case, outcome and unresolved anomalies. Exit conditions also include error handling, repeatability of imports and the ability to restore a previous result. The number of passed tests alone does not describe these properties.

If testing falls short of the intended outcome, useful work consists of defining the problem's boundaries: which populations are covered, which need another cycle and which decisions are deferred. This clarity supports operational transition planning and explains to clients and owners why a particular area remains excluded.

Practical takeaway

Agree exit criteria and treatment of differences in advance so the parallel run supports a reviewable decision rather than a contest between reports.

Sources and further reading

References do not imply product certification or endorsement.

Have a related operational question? Discuss a research or consultation proposal →

Related reading